EV Maritime combines the best design expertise with leading global technologies. The result is a new proposition: high performance electric and hybrid drivetrains, integrating hardware and software into a system that works at the touch of a button. 

Better systems,better future.

EV Maritime is a global leader in electric and hybrid driveline design. We’re delivering turnkey integration packages to some of the world’s most iconic ferry services. 

Our system approach allows us to offer custom solutions unique to your vessel, built on the confidence of highly-developed pre-engineered designs. We then assist you in achieving the required survey or class sign off and take care of commissioning our systems. 

Low emission commercial vessels represent the world’s fastest growing maritime sector. Electric, hybrid and alternative fuel technologies are enabling the inshore maritime industry to make a real contribution to a cleaner, more efficient, sustainable world. 

We are the natural evolution

Choose your system configuration:

EVM D600

Driveline

2
≤ 310 kWh ea.
1
+ Compatible with waterjets, propellers and pod drives
+ EV Maritime Power Management Software 
+ EV Maritime Deputy™ software 
+ EV Metrix™ cloud portal 
+ 2 x Wheelhouse HMI touchscreens 
+ 400-1200 kWh battery capacity 
+ MCS or CCS charging 
+ Hybrid operation with generator 
+ Monthly, quarterly or yearly analysis reporting 

EVM D1200

Driveline

4
≤ 310 kWh ea.
1
+ Compatible with waterjets, propellers and pod drives
+ EV Maritime Power Management Software 
+ EV Maritime Deputy™ software 
+ EV Metrix™ cloud portal 
+ 2 x Wheelhouse HMI touchscreens 
+ 800-1200 kWh battery capacity 
+ MCS or CCS charging 
+ Hybrid operation with generator 
+ Monthly, quarterly or yearly analysis reporting 

Tap a model above to reveal relevant specifications:

Key specifications:

Options:

Want to know more?

Download a case study on our electrical integration package going into five vessels for the Public Transport Authority of Western Australia